banner

Products

Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood

Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood

Specification Product Description Our plastic formwork is made from polypropylene which durability is very good.1.Durabi
SHARE

Description

Basic Info.
Model NO. PP Hollow formwork
Usage Exterior
Color Grey ,White,Black
Surface Finishing Finished
Advantage Reusable, Waterproof, Durable
Thickness 12-21mm
Transport Package Pallets
Specification 1220*2440/1250*2500mm or customized
Origin Jiangsu
HS Code 3925900000
Production Capacity 1200000/Year
Product Description

Specification

Product Name

Plastic Hollow Formwork

Size

915*1830mm/1220mm*2440mm/or customized

Thickness

12-21mm

Certificate

ISO 9001:2008

Type

PP plates

Style

Construction companies

Color

Grey White/Black

Material

Polypropylene

Allication

Concrete pouring support

Reusable Times

60-100 times

Product Description

No need of releasing agent,save cost.
Light weight ,Reduce the labor cost
100% Waterproof Easy to store,easy to clean ,just with water.
Bearable temperature -10ºC~90ºC
Same use as plywoodCut ,nail ,saw ,drill
Reusable time: more than 60 times,save project cost.

Our plastic formwork is made from polypropylene which durability is very good.1.Durability: the useful lifetime is 60-80 times2.Strength: Its resist to a fresh concrete pressure of up to 80kN/m2;3.Easy removal: not requiring any releasing agents, it is sufficient to clean the elements with just water;4.Easy storage: since polypropylene is a non-porous polymer, it is not affected by moisture or water. 5.Size:1220*2440mm/ 915*1830mm6.Thickness:12-21mm

General Operation And Notes Of Instrument For Plastic formwork shuttering :

  • Method of use as well as wooden formwork, plastic formwork reinforcement direction with batten direction placed in cross shaped.
  • No need to smear the mold release agent before using formworks.
  • When cast-in-place the flat plate, spacing between the keels should be 20 ~ 25 cm, and the spacing between the wall plate and keels hould be 10 ~ 20 cm.BEIZHU GROUP pp formwork no need releasing agent lightweight concrete panels best formwork as world.
  • The seam-line between plastic formwork should be taped.
  • The length of nail should not be too long, generally about 30 ~ 35 mm.
  • The strength to drive nailsshould be moderate.
  • When removing the formwork, please start from the small part of one end, the support and the plates should be removed at the same time aiming at preventing the template widespread drops, don't let the corner drop on the ground vertically.
  • The plastic formwork accesses to be mixed used with wood veneer, bamboo veneer and other material plate.
Comparison

Hollow Wall Slab Formwork for Concrete Shuttering Building Construction Instead Plywood

On site picture
Product packagingFAQQ: How can I get the sample?
A:We provide sample free of charge 3-7 work daysQ: What payment terms do you do?
A: 30% T/T as down payment, the balance paid by T/T before shipmentor 100% irrevocable L/C At sight
Q: What is your MOQ for PP hollow plastic formwork?
A: 50 PCS
Q: How long is your delivery time?
A: 10-15 work daysQ: How to pack the product?
A: On pallet and carton or as customers' requirement
Q: How many quantity can load for one 20/40 container?
A: Depend on the size

Our Contact