Reusable 80
Our factory produce NEW PP Plastic construction formwork instead of plywood: 1.REUSE 80-100 times,no need oil. 2.100% Wa
Description
Basic Info.
Model NO. | MTM -PP |
Material | Plastic |
Type | Slab Formwork |
Reuse Time | 80-100 Times |
Color | Grey or Black |
Cost | Save 50% Than Plywood |
How Use | Can Cut, Nail and Screw |
Waterproof | 100% |
Use | Construction |
Customize | Yes |
Normal Size | 1220X2440X18mm |
Raw Material | PP |
Transport Package | Pallet |
Specification | 1220x2440x18mm-21mm |
Trademark | MTM |
Origin | China |
HS Code | 39259000 |
Production Capacity | 6000 Pieces /Day |
Product Description
Our factory produce NEW PP Plastic construction formwork instead of plywood:
1.REUSE 80-100 times,no need oil.
2.100% Waterproof
3.Can cut, nail and screw
4.Save 50% total budget than plywood and metal formwork!
Normal size:
1220X2440X12mm | 23.5kg /pc |
1220X2440X15mm | 26.5kg /pc |
1220X2440X18mm | 31.5kg /pc |
1220X2440X21mm | 34.5kg /pc |
Free sample can be sent for testing.
1. who are we?
We are based in Hebei, China, start from 2009,sell to Domestic Market(40.00%),Eastern Asia(20.00%),South Asia(20.00%),Mid East(15.00%),Africa(5.00%). There are total about 51-100 people in our office.
2. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;
3.what can you buy from us?
formwork,construction formwork,plastic formwork,pp formwork,concrete formwork
4. why should you buy from us not from other suppliers?
Factory price, Stable high classic quality, Guaranteed delivery time
5. what services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FCA,DDP,DDU;
Accepted Payment Currency:USD,EUR,JPY,CAD,AUD,HKD,GBP,CNY,CHF;
Accepted Payment Type: T/T,L/C,D/P D/A,MoneyGram,Credit Card,PayPal,Western Union,Cash;
Language Spoken:English,Chinese,Hindi
Prev: Doka H20 Timber Beam for Formwork
Next: Steel Formwork Used for Concrete Pouring of Building Construction
Our Contact
Send now